Implementing smart energy management concepts in WWTPs

Information

Information

text

Examples

Examples

In the map below, you can find examples of water protection measures within this topic. These actions are picked from the Bank of Actions - if you are interested to browse other water protection actions, visit the Bank of Actions.

Agriculture

Awareness raising

Hazardous materials

Littering etc.

Oil spill prevention

Research and monitoring

Shipping and boating

Stormwater management

Strategies and programs

Wastewater management

Other

Drainage basin


Simulation-based Decision-making tool for WWTP Grevesmühlen

Actor: Aqua & Waste International GmbH   ●   Year: 2017   ●   Address:

© IWAMA - Interactive Water Management projectThe decision-making tool aims to link the inter-dependent treatment components. For this reason a simulation model of the WWTP Grevesmühlen was developed in a step-by-step approach, based on a detailed baseline study and operational data analysis.

WWTP Grevesmühlen currently has a capacity of approx. 65,000 PE. The incoming wastewater is characterized by high proportions of industrial discharges (dairy, coffee production). In addition to the biological treatment, based on the activated sludge process, a central sludge treatment forms the core of the plant. Due to additional digestion of sewage sludge from surrounding WWTPs and various co-substrates, the biogas yield is improved/high.

Besides a sludge thickening and co-substrate receiving station the plant is equipped with a thermal hydrolysis unit to intensify the digestion processes, aiming to further improve the biogas production and dewatering characteristics of the digested sludge. The sludge liquor is treated in a partial flow treatment, based on a two-stage deammonification to significantly reduce the nitrogen load. The complex overall system allows an energy-efficient treatment of wastewater without compromising the effluent quality.

Description

The simulation model of the WWTP Grevesmühlen consists of four functional groups.

  • The first blocks serve to set the input values for the model (operational data of the WWTP, standard values etc.).
  • This unit is followed by the modules for adjusting the kinetic parameters and fractioning.
  • The next group includes all steps for the regular treatment of the incoming wastewater - primary clarifier, 4-lane alternating nitrification / denitrification, secondary clarifier.
  • This is complemented by the blocks of the sewage sludge treatment - thermal hydrolysis, anaerobic digestion with co-fermentation and sludge liquor treatment based on the deammonification process.

Based on a successful calibration and validation of the simulation model including pre-treatment, aerobic biological treatment, sludge digestion, co-fermentation, thermal hydrolysis and deammonification, optimization potentials will be identified. Subsequently, the findings will be implemented in the full-scale operation of the treatment plant. The verification process includes a detailed measurement campaign before and after implementation of the optimization measures.

© Aqua & Waste International GmbH / IWAMA - Interactive Water Management project

Benefits

The successful implementation and application of the decision-making tool will contribute to minimize the discharge of nutrients to the Baltic Sea by optimizing the treatment performance of the WWTP Grevesmühlen. In addition the energetic optimization will contribute the significantly reduce the operational costs of the treatment plant.

Background information

The decision-making tool in Grevesmühlen was developed within Interreg Baltic Sea Region Programme 2014-2020 financed project IWAMA (Interactive Water Management project). Baltic Sea Challenge had close co-operation with IWAMA. The project activities concentrated on developing the capacity of water sector operators and pilot investments to increase energy efficiency and advance sludge handling. All project activities were targeted at better environmental state of the Baltic Sea through reducing nutrient input, optimizing energy consumption of the wastewater treatment plants, training water sector’s employees and ensuring the transfer of knowledge. The partners of the IWAMA project joined the Baltic Sea Challenge network. 

© IWAMA - Interactive Water Management project

Further information

Name: Peter Hartwig   ●  Email: hartwig(a)aquawaste.de   ●  Web page: http://www.aquawaste.de