Bank of Actions
Are you seeking examples or inspiration for water protection? There are plenty of potential actions to choose from! The Bank of Actions will provide your organisation with concrete ideas and examples of water protection activities implemented by organisations in the Baltic Sea Challenge network. You can browse these according to the theme, type of actor, country, year or keyword.
![]() |
Join the Baltic Sea Challenge network by committing to water protection work, and gain the benefits of an international expert Network. Read more about the Baltic Sea Challenge and how to join the network. |
![]() |
The Bank of Actions is always open to ideas for new actions. Is your organisation already a member of the Baltic Sea Challenge network and does it have good examples of water protection measures that it would like to share? Tell us about the work that you do, by filling in this form. We will put your action on the map! |
Agriculture
Awareness raising
Hazardous materials
Littering etc.
Oil spill prevention
Research and monitoring
Shipping and boating
Stormwater management
Strategies and programs
Wastewater management
Other
Drainage basin
Environmental dredging of contaminated sediments
Actor: Port of Turku ● Year: 2009 ● Address: Linnankatu 90, Turku, Finland
The environmental dredging of River Aurajoki was done by the Port of Turku during October 2008 - January 2009. The total mass of sediments that was moved by stabilising to the special lagoon of Pansio was about 88 000 m3.
Description
Contaminated sediments had been found widely on the lower reaches of River Aurajoki. According to the examination tributyltin (TBT) appeared across the sediments of the seabed (0-20cm), furthermore, levels of some heavy metals were also high.
Benefits
The bottom sediments of River Aurajoki’s lower reaches were cleaned. Because of this, it was possible to eliminate spreading of contaminants to the area affected by River Aurajoki discharge, straits and harbour. From the Port of Turku’s point of view, the dredging was a preventive action. In the future the solid substances discharged with the currents are cleaner than before and will not cause problems for the maintenance dredging of the port.
Background information
The action was voluntary. The port found it necessary to carry out the environmental dredging as a preventive action. The EU-Life STABLE project was also a part of the action. The project developed process handling technique of the contaminated sediments in the special lagoon of Pansio.
Further information
Name: Markku Alahäme ● Email: markku.alahame (a) turku.fi ● Web page: http://www.portofturku.fi/